How to calculate retaining wall materials

To estimate a retaining wall, measure its length and exposed height, add buried courses, count blocks per course, then add base gravel, drainage stone, caps, drain pipe and fabric. Round up to whole units and supplier packages, add a waste allowance, and price each line.

RETAINING WALL CALCA retaining wall material listCount each material on its own quantity basis.Wall unitsCapsBase aggregateDrainage stoneDrain pipeGeotextileAdhesiveCheck packagingQUANTITY PLANNINGretainingwallcalc.org
Record each material separately, then check product coverage and supplier packaging.

How to estimate a retaining wall in 6 steps

Use these steps for a block wall takeoff. Confirm the base, embedment and drainage dimensions against the approved plans for your wall system and site.

  1. Measure the length along the wall line and the exposed height of the block face, excluding caps. Enter those dimensions in the block calculator.
  2. Add buried courses. Allan Block’s embedment guidance calls for at least 6 in (150 mm) of buried block for its gravity walls. Use the approved embedment to set buried courses in the block calculator.
  3. Round units per course and exposed courses up separately. Multiply total courses, including buried courses, by units per course. Add a 5–15% cutting and waste allowance based on the layout, then round up to whole blocks. Use the block calculator.
  4. Estimate base gravel. Allan Block’s base guidance calls for at least 6 in (150 mm) of base rock, compacted and leveled, in a trench at least 24 in (610 mm) wide, with a smaller base detail allowed for walls under 4 ft. Use the gravel and drainage calculator with the dimensions from your approved plans.
  5. Estimate the drainage zone. Allan Block’s drainage guidance calls for at least 12 in (300 mm) of wall rock behind the blocks and a drain pipe for walls over 4 ft (1.2 m) or in silty or clay soils. Use the gravel and drainage calculator for stone and pipe quantities.
  6. Count caps and adhesive with the cap stone calculator. Add specified fabric, delivery, labor and tax in the cost estimator.

Measure a retaining wall material schedule

A useful takeoff begins with a record of the wall geometry and the selected products. Write down where every length was measured, whether heights exclude caps, and which dimensions include a mortar joint. A number without that context can mean something different to the installer and the supplier.

Measure changes in height as separate sections. Use a consistent reference line for curves. Obtain the buried-course requirement, base detail and reinforcement schedule from the selected wall system and project design before completing the material estimate.

RecordCheck before entering
Wall runStraight length, reference arc, or individual section lengths
Exposed heightBlock face only, with cap excluded
UnitsInstalled coverage; actual vs nominal dimensions
EmbedmentNumber of buried courses shown in the details
AggregateBase and drainage geometries; supplier density
PackagingUnits per pallet, pipe roll length, fabric roll dimensions

Calculate whole blocks and full retaining wall courses

First divide the run by the unit length and round the result up. Next divide exposed height by course height and round that result up. Add buried courses to the second number, then multiply. Rounding only the final area division can miss an incomplete top course or the cut unit at the end of each row.

For a 24-foot run with 18-inch modules, the course is 16 units long. If the exposed height is 30 inches and the unit height is 8 inches, four exposed courses are needed. Add one buried course and the net quantity is 16 × 5 = 80 units. At 10% allowance, order 88 units. The visible constructed height is 32 inches before the cap.

Keep geometric volume and delivery volume visible

Suppose the approved base geometry is 24 feet long, 2 feet wide and 0.5 feet deep. The geometric volume is 24 cubic feet, or 0.889 cubic yards. With a 10% supply allowance, the planning order becomes about 0.978 cubic yards.

Record the geometric number and the allowance separately. That makes a supplier conversation more useful: you can ask whether the quoted conversion accounts for compaction, delivery rounding or handling. Do the same for the behind-wall stone zone and any hollow-core fill. Do not hide those differences inside a single unexplained tonnage.

Reconcile caps, pipe and sheet materials

Count the capping run with the cap’s installed coverage. Do not assume that the cap count matches the face-unit count. A curved cap pattern or a special corner can change the effective coverage and the number of cuts.

For pipe, distinguish the wall run from the extra outlet allowance and the actual roll length. A 34-foot requirement in 50-foot rolls means one roll to purchase, plus any separately specified fittings and outlet components. For sheet materials, an area estimate is only the first step: roll width, orientation, cut patterns and required details determine how much can be used.

Turn the quantities into an actual purchase order

The calculator reports individual units and geometric aggregate quantities. A supplier may sell only full pallets, full bags or minimum truckloads. Reconcile the list with those rules before comparing delivered prices.

If the takeoff calls for 178 units and pallets hold 75, three whole pallets contain 225 units. A quote based on 225 units is a different purchasing scenario from 178 units sold individually. Ask about partial pallets, unused-material returns and the cost of a second delivery. Keep the product name, finish and quantity together on the final order.

Audit the estimate before you share it

Review the longest and tallest section, buried courses, core-fill requirement, cap coverage, supplier density and every price input. Read the scope notes for any material that was excluded. Confirm that the printed unit system and currency match the supplier’s quote.

Use a shared link to preserve the calculator values, or print a PDF from the browser. The link includes the entered dimensions and prices, so share it only with people who should see them. Attach the actual project drawings where construction details are needed; the takeoff itself does not replace them.

  • Check dimensions against the design and product data.
  • Count special units and fittings separately.
  • Round to the supplier’s real package and delivery sizes.
  • Obtain design and permit review independently of the quantity estimate.

Retaining wall materials list for supplier quotes

Use this checklist to turn the takeoff into separate purchasing lines. Mark each item as required, excluded or awaiting the project detail; quantities and products must come from the selected system and plans.

  • Wall-face units, buried units and the chosen cutting allowance.
  • Separate corners, ends, half units and other special units.
  • Cap stones with their installed coverage and cutting allowance.
  • Leveling-base aggregate and its specified grading.
  • Behind-wall drainage aggregate and any specified hollow-core fill.
  • Drain pipe, fittings and outlet components from the drainage detail.
  • Specified geotextile, cap adhesive and their package coverage.
  • Plan-specified geogrid or other reinforcement, listed separately.
  • Supplier package sizes, minimum loads, delivery and return terms.

Frequently asked questions

What belongs on a retaining wall materials list?

Record wall units, special units and caps, then list the specified base, drainage stone, pipe, fabric and adhesive separately. Add any reinforcement from the approved plan and note exclusions such as fittings and excavation.

How do I include buried courses in the worked takeoff?

In this guide’s 24 ft example, the run takes 16 units per course. Four exposed courses plus one buried course give 80 net units, or 88 with the illustrative 10% allowance. Confirm embedment from the actual wall details.

How do I turn the takeoff into a supplier order?

Keep required units and purchased units separate. Confirm pallet quantities, roll lengths, bulk-load minimums, special units, delivery and returns. Retain the product data and construction details with the order.

How do I price a retaining wall once I have the takeoff?

Multiply each quantity on your takeoff by your supplier’s unit price. Add delivery, labor and any applicable tax. If the installer quotes labor per square foot, multiply that rate by the wall face area. Enter the amounts in the cost estimator, then use the quote comparison guide to compare at least three written quotes on the same scope.

References and scope

Arithmetic and worked examples are explained on our methodology page. The cited sources provide product, pricing or local approval context; they do not approve a generic wall. References checked October 2, 2026.

Read the estimating and engineering limits, or send a correction.