Prepare a section schedule for a wall on a slope
Record a start point, run and exposed height for each estimating section. With the example 16 × 6 inch modules and one buried course, the two 15 ft sections below take 144 net units in total. Apply the 10% allowance once to that combined net count to obtain 159 units.
Keep the schedule with the takeoff so your supplier can see where the height changes. Separate stacked terraces from a single stepped wall; the terraced planning guide explains how to record independent tiers without treating spacing or stability as a calculator output.
| Section | Run × exposed height | Units per course | Total courses | Net units |
|---|---|---|---|---|
| Lower section | 15 ft × 2 ft | 12 | 5 | 60 |
| Higher section | 15 ft × 3 ft | 12 | 7 | 84 |
Calculate a stepped retaining wall on a slope
A wall on sloping ground can have different exposed heights along its run. Enter each rectangular estimating section separately. This tool counts the full courses and units in that section before combining totals, which preserves rounding at section boundaries.
The inputs describe a takeoff layout you have already established. They do not design footing elevations, step spacing, terracing, drainage between walls or the extra embedment at a grade transition.
Net units = Σ[ceil(section length ÷ unit length) × (ceil(section height ÷ unit height) + buried courses)]
Example with two heights
Use two 15-foot sections with exposed heights of 2 feet and 3 feet. With 16-inch × 6-inch units and one buried course, each section is 12 units per course. The first has five total courses and the second has seven.
The net count is 12 × 5 + 12 × 7 = 144 units. Ten percent waste gives 159 units to order. Estimating the entire wall at the taller height would overstate this simple rectangular layout; estimating at an average height can miss the rounding and buried transitions.
Check transitions and returns separately
Each entered section includes the same buried-course count in this model. If different sections need different embedment, make separate project takeoffs or adjust the section heights based on a verified schedule.
Returns, corners, step details, overlapping wall footprints and terraced-wall interaction need individual review. The gravel calculation sums rectangular prisms and does not infer excavation overlap or add transition blocks automatically.
Frequently asked questions
Is the allowance applied separately to each wall section?
The tool rounds units and courses within each section, adds their net unit counts, then applies the entered unit allowance once to that combined count.
What if different sections need different buried courses?
This model uses one buried-course setting across sections. Prepare separate takeoffs when the approved embedment differs instead of assuming the same buried row everywhere.
How do I step a retaining wall base on a slope?
Start at the lowest point and raise the level base in full block heights. Allan Block’s step-up detail calls for compacted wall rock under the base course and a fully buried block at each transition. Its standard detail uses at least 6 in of base rock, with a separate allowance for walls under 4 ft.
How deep is the trench at each step?
Allan Block’s standard step-up detail allows 6 in for the base plus about 1 in per foot of wall height for burial. Extend the trench into the slope far enough to bury one full block at the transition. The same detail gives a 4 in base allowance for walls under 4 ft.
Is a stepped wall the same as a terraced wall?
A stepped wall is one wall with changes in base and top elevation along its run. A terraced wall layout has two or more walls set back from each other. An upper wall can add load to a lower one. Use the terraced retaining wall guide for separate tier takeoffs and design considerations.
How many sections should I enter?
Enter one section for each change in exposed height along the wall. Measure the length and exposed height of each section. The calculator rounds the units per course and the exposed courses within each section, includes the buried courses, then adds those counts together before applying the waste allowance.
References and scope
Arithmetic and worked examples are explained on our methodology page. The cited sources provide product, pricing or local approval context; they do not approve a generic wall. References checked November 3, 2026.
- Allan Block: residential basic installation
- Allan Block: reinforcement installation
- Allan Block: residential retaining wall manual
- Allan Block: stepping up the baseAccessed 3 November 2026.