PROJECT MATERIAL PLANNING

Retaining wall gravel calculator

Estimate retaining wall base gravel, drainage stone and core fill using your dimensions. Convert volumes to US tons or metric tonnes with supplier density.

US & metric units
No account needed
4.79 yd³ stone · $394.33See list ↓
Your wall
ft

Measure along the wall alignment.

ft

Block face only; exclude the cap.

rows

Use the embedment from your plans.

in
in
in

Reference presets change block length, height and depth only. Recheck cap coverage, pallet quantity, core fill, base and drainage details against your supplier’s product and plans.

SECTION VIEW · NOT TO SCALE
3 ftCapDrainage stoneBase aggregate1 buried courseDrainagestoneBaseaggregate1 buriedcourseWall run: 30 ft
Dimensions and material zones follow your inputs. Confirm the construction detail with your wall supplier.
YOUR MATERIAL ESTIMATEPlanning quantity
4.79yd³ stone to order

Base and drainage stone, including 10% supply allowance.

1.12Base · yd³
3.67Drainage · yd³
6.7US tons
MaterialQuantity
Leveling base aggregateVolume plus your stone allowance1.12 yd³
Drainage & core-fill stoneRectangular backfill zone plus selected core fill3.67 yd³
Drain pipe1 roll(s) at 50 ft; fittings excluded34 ft
Geotextile sheet allowanceOne rear face and bottom strip, plus overlap155.25 ft²
Materials at entered prices$394.33

USD · Individual units and volumes; delivery, labor and tax are extra.

See the full takeoff and prices ↓

Getting quotes? Send this list to at least 3 local installers so the quotes are comparable. How to compare quotes →

Material estimate only; verify products and site-specific design.

Estimate the installed cost of this wall →

How much gravel goes behind a retaining wall

In a 30 ft example with 3 ft exposed height, 6-inch courses and one buried course, the constructed height is 3.5 ft. An entered 12-inch-wide drainage zone less a 6-inch soil cap contains 30 × 1 × 3 ÷ 27 = 3.33 yd³ net stone. A 10% supply allowance gives 3.67 yd³ behind the wall.

An illustrative 22-inch-wide, 6-inch-deep leveling pad adds 1.12 yd³ including the same allowance. The combined order is 4.79 yd³, or 6.70 US short tons at an entered 1.4 tons/yd³ density. Core fill is zero in this example. Use the geometry from your plans and the actual supplier density.

The table changes only exposed height. Every row uses the same run, material-zone dimensions, one buried course, 10% stone allowance and zero core fill. Weights use the illustrative 1.4 US short tons/yd³ density and unrounded volumes.

Behind-wall stone = wall run × drainage width × drainage height
Order stone = geometric volume × (1 + stone allowance ÷ 100)
US short tons = order volume (yd³) × entered density (US short tons/yd³)
Entered exposed heightBase with allowanceBehind-wall stone with allowanceCombined volumeCombined US short tons at example density
2 ft1.12 yd³2.44 yd³3.56 yd³4.99
3 ft1.12 yd³3.67 yd³4.79 yd³6.70
4 ft1.12 yd³4.89 yd³6.01 yd³8.41

Calculate retaining wall base and drainage gravel

A retaining wall estimate usually separates the leveling pad below the first course from the drainage zone behind the units. The products, compaction requirements and supplier prices may differ. This calculator keeps both quantities visible and lets you change the entered dimensions independently.

Length × width × depth gives a rectangular volume. Imperial dimensions are converted to feet first, then cubic feet are divided by 27. The metric view uses cubic metres. The output is a geometric takeoff with the percentage allowance you choose, not a laboratory compaction or drainage calculation.

Base = L × (block depth + extra trench width) × base depth
Drainage = L × drainage width × max(constructed height − soil cap, 0)

Add hollow-block core fill to the stone takeoff

Multiply the entered core volume per unit by the net installed units, then add it to behind-wall stone before applying the gravel allowance.

See the retaining wall drainage guide for selecting the core-fill material and measuring the voids.

Convert gravel cubic yards or metres to supplier weight

Multiply volume by the supplier’s density to get weight. The editable default is 1.4 US short tons per cubic yard. See the retaining wall drainage guide for pipe, fabric and supplier details.

Choose stone type and drainage-zone width

Enter the aggregate-zone width shown in your plans. See the retaining wall drainage guide for aggregate grading, rock placement and supplier specifications.

12 in min. drainage zoneGeotextile betweenstone and soilPerforated drain pipeat the back of the base6 in min. compactedbase24 in min. base width (18 in for walls under 4 ft)Cross-section through the wall
Example drainage section with Allan Block gravity-wall base dimensions. Follow the project detail for pipe and fabric placement. Not to scale.

Frequently asked questions

Are the base and behind-wall stone the same quantity?

No. The leveling pad is measured below the wall; the drainage zone is measured behind it. The calculator reports separate volumes so you can request the correct products.

Can I convert gravel volume to tonnes with a fixed rule?

Use the supplier’s density for the actual material. The entered density is an editable example; switching display units converts the physical quantity rather than selecting a new aggregate.

How deep should the gravel base be?

Allan Block’s gravity-wall detail uses at least 6 in of compacted base rock in a trench at least 24 in wide. For walls under 4 ft, its residential step-up instructions give a 4 in base allowance in an 18 in wide trench, plus the additional depth needed for the buried block.

When does a retaining wall need a drain pipe?

Allan Block’s commercial gravity-wall instructions require a drain pipe for walls over 4 ft (1.2 m) or in silty or clay soils. Follow the approved plan for the pipe location and specifications. This calculator uses the wall run and the extra pipe length you enter to estimate how much pipe to buy.

What kind of gravel should I use?

Use the wall rock specified by your block maker. Clean, crushed, angular stone with few fines is one option when it meets the specified grading. Allan Block’s aggregate worksheet calls for compactable aggregate with limited fines. Ask the supplier to match the specified material for the base, the drainage zone and any hollow cores.

References and scope

Arithmetic and worked examples are explained on our methodology page. The cited sources provide product, pricing or local approval context; they do not approve a generic wall. References checked November 3, 2026.

Read the estimating and engineering limits, or send a correction.

A supplier-ready starting list

Bring your dimensions, products and assumptions together in one takeoff.

Back to the calculator