PROJECT MATERIAL PLANNING

Timber retaining wall quantity calculator

Estimate landscape timbers by length, actual section height, buried courses and cutting allowance. Includes editable gravel and pipe quantities.

US & metric units
No account needed
Your wall
ft

Measure along the wall alignment.

ft

Block face only; exclude the cap.

in
rows

Use the embedment from your plans.

in
in

Presets are generic examples. Check actual product coverage and packaging.

Cutting & breakage allowance
%
Schematic wall section showing caps, wall units, base aggregate and the drainage zone. Not to scale.3 ftCapDrainage stoneBase aggregate1 buried courseSECTION VIEW · NOT TO SCALEWall run: 30 ft
Dimensions and material zones follow your inputs. Confirm the construction detail with your wall supplier.
YOUR MATERIAL ESTIMATEPlanning quantity
36timbers to order

32 net units + 4 for cuts and breakage.

28Exposed units
4Buried units
4Spare timbers
MaterialQuantity
Landscape timbers28 exposed + 4 buried + 4 allowance36 timbers
Leveling base aggregateVolume plus your stone allowance0.89 yd³
Drainage & core-fill stoneRectangular backfill zone plus selected core fill3.87 yd³
Drain pipe1 roll(s) at entered roll length34 ft
Geotextile sheet allowanceOne rear face and bottom strip, plus overlap161 ft²
Materials at entered prices$1,656

USD · Individual units and volumes; delivery, labor and tax are extra.

*Pallet packaging is editable. Costs use individual quantities. Material estimate only; verify products and site-specific design.

THE COMPLETE TAKEOFF

Quantities, prices & assumptions

30 ft wall run · 90 ft² exposed face
MaterialOrder quantityEntered unit priceLine total
Landscape timbers28 exposed + 4 buried + 4 allowance36 timbers$35.00 / timbers$1,260
Leveling base aggregateVolume plus your stone allowance0.89 yd³$60.00 / yd³$53
Drainage & core-fill stoneRectangular backfill zone plus selected core fill3.87 yd³$70.00 / yd³$271
Drain pipe1 roll(s) at 50 ft; fittings excluded34 ft$1.25 / ft$43
Geotextile sheet allowanceOne rear face and bottom strip, plus overlap161 ft²$0.18 / ft²$29
DeliveryEntered allowance—$75
Labor90 ft² exposed face$0.00 / ft²$0
Modeled tax0% on materials + delivery—$0
Total example budgetReplace example prices with your quotes$1,731 USD
1 buried course10% unit allowance10% stone allowance6.67 US tons stone at entered density

Count actual timber dimensions

Nominal timber dimensions may differ from the actual finished size. Enter the actual timber length and installed course height. The example starts with an 8-foot timber and a 5½-inch course height; check your supplier’s product before using either number.

The model rounds the timber count in each course and the number of exposed courses upward, then adds buried courses and cutting allowance. Cut-off reuse, staggered joints and posts can change the order schedule.

Order timbers = ceil(ceil(run ÷ timber length) × (ceil(exposed height ÷ actual course height) + buried courses) × (1 + waste/100))

Anchors and fasteners need a design

The calculator does not choose deadmen, anchors, posts, spikes, screws or connection spacing. A fixed “one anchor every few feet” rule is not a safe substitute for a timber wall design.

Timber treatment, ground-contact suitability, connection durability, drainage and the planned service life need separate review. Use the selected product documentation and local design requirements.

Use the list for a supplier quote

Timbers can have minimum order sizes and delivery requirements that differ from block pallets. The tool reports individual timber quantity. The entered unit price is an example and should be replaced with a local quote.

Base, drainage and pipe remain editable planning quantities. They do not establish that a timber wall foundation or drainage detail is sufficient. Print the assumptions and attach the construction drawings when requesting an installation quote.